How it works
Each timing gate is an industrial through-beam photocell plus a small gate unit. When a rider breaks the beam, the unit records a timestamp straight away and sends it over the network to the tower. The result is the difference between two gates’ timestamps, so cable length and network delay do not affect it.
Placement on the track
Section titled “Placement on the track”The beam crosses the full width of the track just above the surface. The transmitter is on the outer barrier and the receiver on the infield rail. Nothing stands in the safety zone. The beam is low enough that the wheel of a rider on the black line breaks it.
A session, step by step
Section titled “A session, step by step”- The rider scans the QR code at the track and logs in.
- They pick an effort, for example a flying 200 m. The track shows as busy.
- They ride the wind-up. Timing starts at the first gate.
- After the finish, the time appears on the trackside TV and the rider’s phone, and is saved to their history.
One rider at a time
Section titled “One rider at a time”An optical gate knows that someone crossed, but not who. The time belongs to the rider who started the session, so the system times one rider at a time. That is enough for solo training. Group sessions with chips are planned as an extension.